Manufacturing and quality checklists
Checklists for plant floors: powered industrial trucks, machine energy control and, for UK sites, work equipment and local exhaust ventilation. They're written for supervisors, maintenance staff and EHS teams who need a dated record of what was checked, who checked it and what happened when something failed.
The forklift inspection checklist follows OSHA's daily examination rule in 29 CFR 1910.178 and says when a truck has to come out of service. The lockout/tagout checklist records one energy control job from shutdown to restart against 29 CFR 1910.147, and it's meant to sit beside your machine-specific procedure, not replace it.
For sites in Great Britain, the PUWER compliance checklist covers the Provision and Use of Work Equipment Regulations 1998, and the industrial LEV testing checklist follows HSE guidance on thorough examination and testing of local exhaust ventilation under COSHH. Each page names the jurisdiction it was written for, so check that before you use it.
- Forklift daily inspection checklist
Free daily forklift inspection checklist based on OSHA 29 CFR 1910.178: walk-around, operating checks and an in-service decision. Fill in, print or save.
- Industrial LEV testing checklist
Free industrial LEV testing checklist for the COSHH thorough examination and test: preparation, system checks, hood readings, report and follow-up.
- Lockout/tagout checklist
Free lockout/tagout checklist based on OSHA 29 CFR 1910.147: shutdown, isolation, stored energy, verification and release in order. Fill in or print.
- PUWER compliance checklist
Free PUWER compliance checklist for one item of work equipment: suitability, maintenance, inspection, training, guarding and controls, from HSE guidance.
Run them in Irada
- Assets and pre-use checks: Run the check against a registered asset. A failed critical item takes the asset out of service until an authorized person who did not do the repair returns it.
- Inspections: Publish the checklist as a versioned template, schedule or assign it, and keep each completed record with signatures bound to the answers.
- Corrective actions: A failed item opens one corrective action. Closing it needs evidence, and the person who fixed it cannot verify their own fix.
- Permits to work: Your own permit types with plan approval, issue at the location, isolation applied and verified by different people, handover and handback. Irada supplies no approved regulatory permit content.